Frontwave Arena Signs Deals on Solar, BESS Projects
Frontwave Arena has inked a local partnership with Baker Electric on a solar project and signed a PPA with DSD Renewables to utilize energy produced at the site. Baker Electric will install a fully integrated 797.09 kW rooftop solar system consisting of 1,350 panels, along with a large-scale battery energy storage system. The project is […]
The post Frontwave Arena Signs Deals on Solar, BESS Projects appeared first on Solar Industry.